![]() ![]() Our range caters to various material handling needs, making us a go-to choice for industries dealing with granules, aggregates, coal, and more.Ĭhoose from a plethora of configurations to match your specific requirements. Whether it's dry, dusty powders or heavy granules and aggregates, these elevators ensure seamless and reliable vertical conveying.Īs a trusted manufacturer, exporter, and supplier, we take pride in offering a spectrum of bucket elevator designs and sizes. Engineered with precision, these elevators come in three fundamental types - centrifugal, continuous, and positive discharge conveyors-offering unparalleled efficiency across diverse applications.Ĭrafted by industry-leading experts, our bucket elevators are designed to effortlessly transport materials vertically at higher elevations. ![]() Service Platforms and Access Ladders AvailableĮlevate your material handling capabilities with our top-tier Bucket Elevators.Inspection Doors on Both Sides of Discharge.Adjustable Throat Plate at Discharge If Required.Horizontally and Vertically Heavy-Reinforced, Welded Head, Boot, And Intermediate Sections.That means less opportunity for accidents. Additionally, filling the hopper with material and using the conveyor, rather than dumping from the side of the trench, keeps a loader away from the trench edge. SAFETY – the excavator operator controls the conveyor from the cab, maintaining a direct line of site into the trench and on either side.Only a single lane is necessary because material is loaded into the hopper located directly behind the excavator. Eliminate the need for flaggers and road closures.Material is held in the hopper and transferred via conveyor belt under the car body to your waiting bucket, to be placed and used as needed when the pipe crew is ready. Reduce machine swing cycle time by almost 75%. ![]() A job site loader is the best method of charging the hopper with material. The hopper contains your bedding material, which means no material is wasted on the ground. Use only the amount of bedding material you need.How do Felco Bedding Conveyors help you put more sewer and water pipe in the ground than any other method? With the Bedding Conveyor, you control when, where and how much bedding material is placed in the trench while bedding pipe. Once mounted, the Bedding Conveyor can be removed or reattached within 10 minutes. Additionally, with bolt-in Conveyor Extensions, Felco Bedding Conveyors can be moved to other excavators and mounted with the purchase of an additional installation kit. With five different models to accommodate 100 class excavators and up, the bedding conveyors can accommodate a wide range of machines. ![]() The Felco Bedding Conveyor can deliver one cubic yard of bedding material from the hopper to the front of the excavator every 7 – 10 seconds. The Felco Bedding Conveyor replaces cumbersome bedding boxes, reduces the time it takes to bed a piece of pipe, minimizes waste of material and keeps the excavator operator’s attention on the trench. The entire system is operated from the cab. Typically operators shoot the amount of material they need into their digging bucket to then place on the pipe in the trench. A hopper behind the excavator is filled with bedding material, then a hydraulic motor runs the conveyor belt which transfers the material that comes out the bottom of the hopper between the excavator tracks to the front of the excavator. The Bedding Conveyor allows pipe bedding material to be delivered and placed with the lead excavator. It is still a mainstay on large pipe jobs nationwide. He was a sewer / water contractor in the Seattle and Portland area, and developed the attachment as a way to get bedding material into the trench on tight jobs. The Felco Bedding Conveyor System was developed by John Felton, the founder of Felco. ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |